CRYPTO WITHOUT KYCGPU rental · 3, 7 or 30 days
Capordia
Language: English
Menu
02 / Comparison

Compare a setup, not just a card.

Before choosing a setup, first check that your software, the memory per card, the machine resources and the time slot you need are compatible with the team's work. An unknown mandatory requirement still has to be confirmed. Then compare the eligible candidates at identical duration and scope, and plan their acceptance. The table describes the offerings; it does not rank their speed.

Rental duration
Totals in USD for the selected batch
Number of GPUs
15 reference(s)
Scroll to view all columns →
Configuration2 × NVIDIA B200 SXMNVIDIA H200 SXM 141GBNVIDIA H100 SXM 80GBNVIDIA H100 PCIe 80GBAMD Instinct MI300X 192GBNVIDIA A100 SXM 80GBNVIDIA L40S 48GBNVIDIA RTX 6000 Ada 48GBNVIDIA GeForce RTX 5090 32GBNVIDIA GeForce RTX 4090 24GBNVIDIA RTX A6000 48GBNVIDIA A40 48GBNVIDIA L4 24GBNVIDIA GeForce RTX 3090 24GBNVIDIA RTX A5000 24GB
GPUs per lot211111111111111
VRAM per GPU180 Go141 Go80 Go80 Go192 Go80 Go48 Go48 Go32 Go24 Go48 Go48 Go24 Go24 Go24 Go
Memory typeHBM3eHBM3eHBM3HBM2eHBM3HBM2eGDDR6 ECCGDDR6 ECCGDDR7GDDR6XGDDR6 ECCGDDR6 ECCGDDR6GDDR6XGDDR6 ECC
Total / 3 daysUSD 887.57USD 274.29USD 203.57USD 180.00USD 192.86USD 120.00USD 63.43USD 55.71USD 66.43USD 47.14USD 35.14USD 29.14USD 30.00USD 27.86USD 23.57
Lots available41963278787426100265653710418651
Cards available81963278787426100265653710418651
LocationChoose Choose Choose Choose Choose Choose Choose Choose Choose Choose Choose Choose Choose Choose Choose
01

Set the criteria before looking at the price

A useful comparison starts with a short common record. Fix the application version, its backend, the input set, the precision, the work batch sizes and the quality criterion. If you change any of these parameters, record it as a separate experiment. Then keep the reason each candidate was eliminated or selected.

For a migration to AMD, consult the ROCm matrix matching your hardware and your software stack. Published compatibility is a prerequisite; it does not prove that your application or a requested environment preparation already works. Acceptance must verify the versions and the result on the target.

Common comparison record — fill in before the test
CriterionExpected value or documentConsequence for the decision
CompatibilityApplication, version, backend and dependenciesExclude an option with no verifiable execution path
Usable memoryObserved peak with its unit, settings and marginCheck the per-GPU capacity required by the task
Work distributionIndependent tasks or multi-GPU applicationDefine cards per lot and number of useful lots
Accepted resultTest set and quality threshold setCompare only results that meet the same need
Period and budgetSame duration in days, same number of lots, total in USDCompare a financial commitment of the same scope
02

Distinguish lots, cards and memory per GPU

A lot is the rental unit. The number of cards depends on the configuration: a B200 lot contains two cards, while an RTX 4090 lot contains one card. The number of cards requested is calculated as follows: number of lots × cards per lot. The total in USD is calculated using the lot price and the chosen duration, without multiplying a second time by the number of cards.

The memory indicated is that of each GPU. Two 180 GB B200s represent two 180 GB memory spaces; their arithmetic sum is not memory automatically available to a task. NVIDIA describes the software and hardware conditions for multi-GPU exchanges. The topology and links of the machine concerned must be observed, not inferred from the model name.

Keep the units of your readings. A decimal GB corresponds to one billion bytes; a GiB corresponds to 2 to the power of 30 bytes. A discrepancy between the spec sheet and a tool displaying binary units must be explained before concluding that memory is lacking. The advertised capacity also does not give the free memory during your run.

03

Compare a cost under identical financial conditions

Here is an example budget, taken from our catalog on September 24, 2026. A team is looking at a single lot for seven days, with a single card. It provisionally assumes a workload that fits within 24 GB, subject to its test. This assumption opens up two options to examine; it gives them neither the same speed, nor the same software support, nor the same result.

For this scope, the price difference is 110.00 − 55.00 = 55.00 USD. This is a difference in commitment over seven days. Without measured time for an accepted result, the cost per completed task cannot be inferred. The team's preparation time and any external transfer or payment fees must be examined separately; they are not costed here.

Example as of September 24, 2026 — one lot, one card, seven days; Capordia catalog price
ConfigurationBatchesCards per lotVRAM per GPUDurationPackage total
NVIDIA GeForce RTX 40901124 GB7 days110,00 USD
NVIDIA RTX A50001124 GB7 days55,00 USD
04

Keep a decision the team can accept

End the comparison with four lines: option chosen, determining criterion, accepted limit and remaining check to perform. If results are missing, mark the decision as provisional. A larger capacity is only relevant if it solves an identified constraint; a lower price does not prove that the task will cost less to complete.

Acceptance file v1 includes a grid of ten checks, a decision template, documented inventory commands and a fictional example. Fill in your inputs, observations with units and the evidence supporting each status. These documents contain no GPU measurements. They help organize the evidence your team will need to gather.

05

Shortlist candidates, then clear the conditions

To recommend a configuration to your team, start with a short list of eligible candidates. A mandatory criterion that is not met rules out an option; a mandatory criterion that is unknown leaves it to be confirmed. Price, familiarity with a tool or headroom then separate the options that cover the need. A preference does not make up for a missing requirement.

The same sheet is used to look for an alternative to your current environment: keep the constraints that must survive the change and name those you are willing to modify. Asking for more cards does not by itself solve a problem of queueing, data preparation or available duration.

Team selection — expected evidence and decision to keep
Mandatory criterionEvidence to gatherDecision and limit
Concurrent workloadsWork plan: independent tasks or distributed application; cards used per task.Retain an executable organization. Multiple lots prove neither colocation nor interconnect between GPUs.
Machine resourcesAgreed scope: CPU, host RAM, usable space, paths, network flows; inventory on receipt.A missing essential minimum remains to be confirmed. GPU spec sheets do not document these machine resources.
Usable time slotSchedule with preparation, transfer, tests, processing and export; availability of the target to be confirmed.Rule out a time slot incompatible with the deadline. Displayed stock does not reserve a delivery date.
Location and commitmentsIf required: location of the target, point of contact, handling and acceptable responsibilities, confirmed in the contractual scope.Suspend if these requirements remain unknown; rule out an incompatible scope. Spec sheets guarantee neither hosting region nor support level.
Retrieval and recoveryFinal destination, export window, read verification; recovery procedure if required.Keep evidence R05, R06, R08 and R09. The catalog proves neither included backup nor retention after the period.
Team able to accept deliveryApplication owner, relay operator, required access and the person who accepts the result.Check handover R10. A merchant account does not demonstrate technical rights on the target.
06

Two situations for building your selection

First situation, hypothetical: your independent task requires 40 GB per GPU, margin included, based on your own measurement and the same units as the spec sheet. Nominal capacities below that are ruled out. The 48 GB L40S, RTX 6000 Ada, RTX A6000 and A40 may join the list to examine: each lot contains one card. This list covers the four 48 GB options in the catalog; it does not rank their speed and does not exclude higher capacities. Software, actually free memory and machine resources still need to be verified.

Second situation: an application must distribute the same processing across two GPUs. The B200 lot provides two cards to examine, but its name alone is not enough to validate this scenario. Document the distribution, the versions and the required exchanges, then compare them with the proposed machine. If your project requires a specific topology that is still unknown, the selection remains provisional. Two independent tasks constitute another scenario, with a memory check and an accepted result for each.

07

Know when to suspend the decision

This option is less suitable for a team expecting a fully managed application, immediate preparation or an already guaranteed availability commitment. Choosing an environment in the order does not prove a working installation. If these points are essential, record the information or commitment to be obtained before selecting the offer.

Acceptance then verifies the agreed target and test case. A successful launch validates neither all datasets nor future periods. In the grid, distinguish compliant, deviation and unverified; a mandatory check not performed prevents declaring the scope accepted. Keep the evidence, the accepted limit and the decision-maker's name, with an explicit reservation or a refusal depending on the deviation.

Questions to decide

Can two 180 GB cards directly load a 360 GB task?

No, not automatically. Each card keeps its own memory. You need an application capable of distributing the task and an appropriate hardware configuration. The actually usable capacity and the exchanges must be verified with the planned settings.

How do you compare a lot containing two GPUs with a lot containing a single GPU?

First compare what your application can actually use, then compare the same duration and the same covered requirement. The price of a lot covers the cards it contains. A per-card price can help you read the budget, but it does not prove useful capacity or equivalent speed.

Why is the cheaper RTX A5000 not declared better than the RTX 4090?

The seven-day plan costs USD 55.00 for an RTX A5000 lot and USD 110.00 for an RTX 4090 lot in our September 24, 2026 catalog. No shared test of your workload justifies a performance ranking here. The choice also depends on compatibility, the quality achieved and the time to finish the work.

What remains to be checked after selecting a model?

Check the machine concerned, the software versions, the required resources and the result of the test set decided in advance. The acceptance grid keeps the manufacturer's specification, the machine observation and the acceptance of your task separate. A mandatory check that was not performed does not count as compliance.

To prepare for what comes next

Open the operations library